Examples and Comparison

Example 6.1: active suspension

For a known short road disturbance, OLOC can optimize actuator force u(t)u(t) to reduce body acceleration and suspension deflection. This yields a best-case force history for that road profile. The result may reveal when strong actuation is needed. A final controller instead maps measured suspension deflection and body velocity to force, and its gains are tuned or co-designed in closed loop.

Example 6.2: wind turbine

Optimizing blade-pitch trajectory against a known wind trace gives an ideal load-reduction benchmark. A real turbine does not know the future gust exactly, so an implementable controller uses rotor-speed and load measurements, perhaps with preview. MPC or gain-scheduled feedback is a more realistic final architecture.

Example 6.3: marine energy device

OLOC can optimize PTO force for a recorded wave sequence and estimate theoretical energy capture. A practical controller must operate from measured or forecast waves. Closed-loop CCD redesigns geometry or PTO hardware together with that realizable controller.

Example 6.4: prediction horizon and architecture complexity in a quarter-car study

A study of six quarter-car active-suspension architectures makes the OLOC-versus-MPC trade-off concrete. Each architecture connects the road input to a single translational-force actuator through a different number of auxiliary masses, springs, and dampers—from a control-only case with no additional plant design variables up to a six-design-variable architecture. All six architectures share the objective

ψd=t0tf(w1(zUδ)2+w2z¨S2+w3F2)dt,\psi_d=\int_{t_0}^{t_f} \left( w_1(z_U-\delta)^2 +w_2\ddot z_S^2 +w_3F^2 \right)dt,

combining road-handling performance, passenger comfort (sprung-mass acceleration), and a control-effort penalty. For each architecture, the plant variables and the controller’s prediction horizon pp are optimized together in a nested CCD loop—once with OLOC in the inner loop, and once with MPC at p=40,10,5p=40,\,10,\,5 for a fixed control sampling time.

Two findings stand out:

Comparison

ApproachMain decisionStrengthLimitation
Open-loop optimal controlFull trajectory u(t)\mathbf{u}(t)Flexible benchmarkMay need unrealistic future information
Controller-parameter optimizationGain or coefficient vector xc\mathbf{x}_cDirectly implementableLimited by chosen structure
Feedback-controller CCDPlant and controller parametersRealistic closed-loop designMore restrictive than free trajectories
MPCRepeated finite-horizon plansFeedback with constraints and predictionRequires online optimization and a good model

Common mistakes

  1. Confusing a trajectory with a controller. A planned signal is not a feedback law.

  2. Treating OLOC as automatically implementable. It may rely on impossible information.

  3. Ignoring the real information set. Controllers use only measured, estimated, or credibly forecast quantities.

  4. Assuming feedback removes all uncertainty. Feedback mitigates but does not eliminate noise and mismatch.

  5. Calling MPC purely open loop. Repeated measurement-based replanning creates feedback.

  6. Assuming parameterized controllers are always inferior. A realizable feedback policy can outperform a nonimplementable ideal signal on the uncertain real system.

  7. Treating the MPC prediction horizon as fixed. Prediction horizon and control sampling time can be optimized alongside plant variables in a nested CCD loop; treating them as fixed implementation details after the fact overlooks a first-order design choice.