Nested and simultaneous formulations target this same set when their models and constraints match. A one-pass baseline evaluates only the slice at its frozen pseq. An iterated baseline samples a path of handoff points but does not necessarily characterize PCCD.
Plant-only feasibility can be misleading in both directions. A passive constraint may reject a plant that active control could make feasible, while a plant-only optimum may require actuator effort unavailable to the final controller.
Activity 5.6: compute the coupled feasible plant set¶